Pump Station Expansion: Planning Today for Tomorrow’s Flow

Pumping projects may seem simple on paper: water flows into one place and needs to reach another. However, there are many factors that can affect the distance between two points, including elevation of the ground, flow rate, solids, pressure, storage capacity, and access for maintenance.

Romtec Utilities’ method of developing a pump station is to first establish the operational requirements. This is followed by selecting the appropriate equipment. Then, preliminary designs and budgetary requirements can be developed based on what the needs of the project.

Image credit: romtecutilities.com

Begin with a simple question: How are we moving?

The answer immediately changes the technology.

The flow of domestic sewage is subject to significant fluctuations throughout the day. The wastewater lift station is required when gravity conveyance is not or will not function. Engineers need to take into account the expected inflow, peak conditions the capacity of pumping, wet-well behavior, discharge requirements, as well as how the facility will be used and maintained.

Different challenges are presented by industrial water. Fluids that are caustic or oily or have high temperatures or pressures may be needed by a manufacturing or processing facility. Romtec Utilities designs industrial systems that can be used for everything from power generation and food processing to data centers pharmaceutical waste, oil and gas facilities.

Rainfall could create a completely distinct operating cycle

Stormwater systems are usually inactive for extended periods but then suddenly they face the possibility of a huge volume in the course of a storm.

A stormwater liftstation associated with an detention basin must work, for example, as part of the larger drainage plan for the site. Runoff enters the basin temporary storage is responsible for the volume immediately and the pumping system moves collected water toward an approved discharge point.

Romtec Utilities offered this type of solution to a Norco, California business park. This project needed a pumping system to empty a detention basin into the stormwater system of the public. The station needed to be designed as a part of the drainage infrastructure for the development, and not as a separate piece of equipment.

Package Does Not Infer “Off the Shelf”

A common misconception is that a package pumping system is simply a predetermined collection of components.

For infrastructure that is engineered, packaging could mean coordinating all the major pieces into one specific system for the project. The valves and pumps can be selected based on their job requirements.

This approach is particularly useful when a new system needs to be connected to existing infrastructure. In the case of industrial facilities and municipal buildings, there’s usually enough space or a totally clean space for installation. Equipment might need to be positioned within existing structures, piping as well as electrical systems and operating schedules.

The real consequences of capacity Planning

The price of undersizing goes up when the facility is expanded.

At Portland International Airport, Romtec Utilities provided the sewer interceptor station for the PDX Next expansion. The station was constructed to provide double the peak flow capacity of the prior system, as the airport facilities expanded.

It demonstrates an important engineering principle: design conditions shouldn’t be limited to what a facility is able to handle during a typical afternoon. Engineers must know what happens at peak demand.

The job isn’t done until the Equipment arrives

At the point where drawings and calculations have to become an operational system. Coordination of installation and documentation are crucial to the long-term success of.

What happens following the installation of a pumping device determines the quality of the system. The choices made in the initial design are clearly visible when the equipment requires maintenance flow increases or an event occurs.

Romtec Utilities integrates these options to create a complete pumping solution for a particular project. It assists in transforming equipment into infrastructure that is made specifically for the environment that it will be used.